In 2015 HVA in association with another Dutch international operating consultancy Company AC conducted a study for the feasibility of a sugar project along the Wabe Shebelle river in Eastern Ethiopia. The crop has to be irrigated with a CP system. The overall project area is about 11,000 ha under sugarcane and a mill capacity of 6000 TCD.