|






| |
PROJECT
|
|
MIAN-AB
CANE SUGAR STUDY, IRAN
|
ASSIGNMENT
|
|
Feasibility study for a sugar factory, animal feed plant and hardboard
factory, using bagasse as raw material.
|
CLIENT
|
|
Mian-Ab Cane Sugar Agro‑Industrial Project, Iran.
|
SERVICES FINANCED BY
|
|
Government of Iran.
|
STAFF INVOLVED
|
|
Team
Leader/ Factory Design Engineer, By‑product Technologist, Mechanical
Engineer, Sugar Technologist, Economist and a Cane Mechanization Expert/
Agricultural Engineer.
|
PERIOD OF ASSIGNMENT
|
|
1987-1988 / 1992-1993
|
BACKGROUND OF PROJECT
|
|
Feasibility study for the construction of a 5,000 tcd cane sugar factory
with the possibility of extension to 10,000 tcd, and the utilization of the
by-products bagasse and final molasses. The studies were made together with
the Iranian consultancy firm of OSVEH.
|
SCOPE OF WORK
|
|
The
services provided included the design and lay-out of a sugar factory, farm
buildings and auxiliary buildings. Costing and lay-out of a cattle feed
production plant from bagasse pith and final molasses, design of a
particle‑board production unit from depithed bagasse. Review of the cane
cultivation, harvesting and transport system, planned by local consultants,
and assessment of the irrigation and drainage system. Planning of
maintenance systems for agricultural equipment, and planning and design of
workshops.
The overall consolidated financial analyses led to a positive
recommendation. As a result the detailed design, tender specification and
evaluation, and supervision on implementation of a 5,000 tcd factory and a
300 tonnes per day refinery were awarded to HVA, together with the Iranian
consultancy firm of Enerchimi, and carried out during 1992/93.
|
|